Market Data

GTA market data

Published figures from Statistics Canada, the Bank of Canada and the City of Toronto. Every number here carries its source, the date it refers to, and how it was worked out.

No forecast is offered on this page, and no opinion of the value of any particular property. Figures are collected every morning.

Borrowing

What it costs to borrow

Four rates, running from the one the Bank of Canada sets to the one a lender posts. They are the figures a mortgage is priced from, and they move at different speeds — two of them change on any business day, two of them weekly.

None of them is a rate you would be offered. What you are quoted depends on your own circumstances, and only a lender or a broker can tell you that figure.

Policy rate

2.25%

Equal lowest of the 25 months recorded here. Unchanged from the same month a year earlier.

The rate the Bank of Canada charges banks. It moves prime, which moves a variable mortgage.

What this means for Policy rate

This number, in plain words. The Bank of Canada's rate is 2.25%. When it moves a quarter of a point, prime usually moves the same quarter within days — and a variable mortgage moves with prime.

What up and down mean. When a rate goes up, borrowing costs more; when it goes down, borrowing costs less. A variable mortgage follows prime as it moves. A fixed mortgage is set on the day you sign and does not move until you renew.

What it does not say. None of them is a rate you would be offered. A lender prices a mortgage on your circumstances, and a broker can quote a real figure. Nothing here is a prediction of where rates go next.

As of 19 October 2026 · Checked 20 October 2026

5-year GoC benchmark

3.64%

Higher than 23 of the 24 earlier months recorded here. Up 0.94 points from the same month a year earlier.

What the government pays to borrow for five years. Fixed mortgage rates follow it more closely than they follow the policy rate.

What this means for 5-year GoC benchmark

This number, in plain words. The benchmark is 3.64%. Lenders price five-year fixed mortgages above this figure, which is why a fixed rate tracks it more closely than it tracks the policy rate.

What up and down mean. When a rate goes up, borrowing costs more; when it goes down, borrowing costs less. A variable mortgage follows prime as it moves. A fixed mortgage is set on the day you sign and does not move until you renew.

What it does not say. None of them is a rate you would be offered. A lender prices a mortgage on your circumstances, and a broker can quote a real figure. Nothing here is a prediction of where rates go next.

As of 19 October 2026 · Checked 20 October 2026

Prime rate

4.45%

Equal lowest of the 25 months recorded here. Down 0.25 points from the same month a year earlier.

The rate a variable mortgage is quoted against — usually as prime minus something.

What this means for Prime rate

This number, in plain words. Prime is 4.45%. A variable mortgage quoted at prime minus 0.60 would work out to 3.85% today, and would move again the next time prime does.

What up and down mean. When a rate goes up, borrowing costs more; when it goes down, borrowing costs less. A variable mortgage follows prime as it moves. A fixed mortgage is set on the day you sign and does not move until you renew.

What it does not say. None of them is a rate you would be offered. A lender prices a mortgage on your circumstances, and a broker can quote a real figure. Nothing here is a prediction of where rates go next.

As of 14 October 2026 · Checked 20 October 2026

5-year conventional mortgage

6.19%

Higher than 17 of the 24 earlier months recorded here. Up 0.10 points from the same month a year earlier.

The posted rate, which is not the rate you would be offered. A broker can quote you a real one.

What this means for 5-year conventional mortgage

This number, in plain words. The posted rate is 6.19%. It is a published list rate rather than an offer — a lender prices a mortgage on your own circumstances, and a broker can get you a real figure.

What up and down mean. When a rate goes up, borrowing costs more; when it goes down, borrowing costs less. A variable mortgage follows prime as it moves. A fixed mortgage is set on the day you sign and does not move until you renew.

What it does not say. None of them is a rate you would be offered. A lender prices a mortgage on your circumstances, and a broker can quote a real figure. Nothing here is a prediction of where rates go next.

As of 14 October 2026 · Checked 20 October 2026

New-home prices

What newly built homes cost

This is the only price measure on this page, and it is a narrow one. It tracks what newly built homes cost in Toronto, as an index rather than a dollar figure — 100 is the base year, so 106 means six per cent above it.

It says nothing about resale prices, which are what most buyers and sellers are asking about. Those figures belong to the real estate board and are not published here.

New housing price index

As of 31 August 2026 · Checked 20 October 2026

106.0

Higher than 2 of the 24 earlier months recorded here. Down 4.8 points from the same month a year earlier.

New housing price index over 25 months to 31 August 2026. Every figure is in the table below.100.0103.9107.9111.8115.8Aug 2024Aug 2025Aug 2026

The vertical axis starts at a round number below the lowest reading, not at zero, because an index that moves between 104 and 112 is a flat line above a zero baseline. The starting value is printed on the axis.

What this means for New housing price index

What it is. A measure of what newly built homes cost in Toronto, expressed against a base year set to 100.

This number, in plain words. The reading is 106.0. The base year is 100, so a newly built home costs 6.0 per cent more than it did in that base year. It is a ratio and not a price — 106.0 is not a number of dollars.

What up and down mean. When the line goes up, newly built homes cost more than they did the month before. When it goes down, they cost less.

What it does not say. It is not a resale price and it is not a dollar amount. A reading of 106 means six per cent above the base year, not $106 and not $106,000. It says nothing about what an existing home sells for.

MonthNew housing price indexChange from the month before
31 August 2026106.0+0.2
31 July 2026105.8−0.2
30 June 2026106.0+0.1
31 May 2026105.9−0.3
30 April 2026106.2−0.9
31 March 2026107.1−1.0
28 February 2026108.10.0
31 January 2026108.1−1.2
31 December 2025109.3−0.1
30 November 2025109.40.0
31 October 2025109.4−1.0
30 September 2025110.4−0.4
31 August 2025110.8−0.1
31 July 2025110.9−0.1
30 June 2025111.0−0.2
31 May 2025111.2−0.9
30 April 2025112.1−0.5
31 March 2025112.6−0.2
28 February 2025112.8+0.2
31 January 2025112.6−0.5
31 December 2024113.1−0.4
30 November 2024113.5+0.3
31 October 2024113.2−1.4
30 September 2024114.60.0
31 August 2024114.6—

New housing price index, every month shown on the chart above — newest first, with the change from the month before. A dash means the month before it was not published.

Construction

How much is being built

Two measures of how much housing is on the way, and they happen in order. A permit is the City’s permission to build. A start is the day the ground is actually broken, which can be months or years later — or never.

Neither is a finished home and neither is a home for sale. Both are counted for the City of Toronto only.

Housing starts

As of 30 September 2026 · Checked 20 October 2026

1,440

Higher than 4 of the 21 earlier months recorded here.

Housing starts over 22 months to 30 September 2026. Every figure is in the table below.09481,8962,8453,793Sep 2024Oct 2025Sep 2026

Homes on which construction began in Toronto that month. The axis starts at zero. Where the line breaks, Statistics Canada did not publish a figure for those months.

What this means for Housing starts

What it is. The number of homes on which construction physically began in Toronto in a given month.

This number, in plain words. Ground was broken on 1,440 homes in Toronto that month. It counts homes STARTED — none of them was finished that month, and none of them was for sale that month.

What up and down mean. When the line goes up, more homes broke ground that month than the month before. Because a home takes years to finish, this line moves long before the number of homes available does.

What it does not say. It says nothing about when those homes will be finished, or whether they are for sale. A month with few starts is not a shortage today — it is a shortage in two or three years.

MonthHousing startsChange from the month before
30 September 20261,440+248
31 August 20261,192−348
31 July 20261,540−592
30 June 20262,132−992
31 May 20263,124+44
30 April 20263,080+1,575
31 March 20261,505+433
28 February 20261,072−1,240
31 January 20262,312−150
31 December 20252,462+411
30 November 20252,051+606
31 October 20251,445—
30 June 20251,701−1,811
31 May 20253,512+1,222
30 April 20252,290+1,065
31 March 20251,225−254
28 February 20251,479−889
31 January 20252,368+1,388
31 December 2024980−1,321
30 November 20242,301−188
31 October 20242,489+756
30 September 20241,733—

Housing starts, every month shown on the chart above — newest first, with the change from the month before. A dash means the month before it was not published.

Building permits

As of 31 July 2026 · Checked 20 October 2026 · due for an update

$1.36 billion

Higher than 17 of the 23 earlier months recorded here. Down $120.0 million from the same month a year earlier.

Building permits over 24 months to 31 July 2026. Every figure is in the table below.$0k$545M$1.1B$1.6B$2.2BAug 2024Jul 2025Jul 2026

The value of residential building permits issued in Toronto that month, before construction begins. The axis starts at zero.

What this means for Building permits

What it is. The total value of residential building permits issued in Toronto in a given month.

This number, in plain words. $1.36 billion is the value the City put on the permits it issued that month. It is what somebody was given permission to build, before any ground is broken — not what the finished homes would sell for.

What up and down mean. When the line goes up, the City approved more building work by value that month. A permit comes before construction, so this line moves earlier than housing starts does.

What it does not say. A permit is a permission, not a building. Some are never used, and the value on a permit is not what the finished homes will sell for.

MonthBuilding permitsChange from the month before
31 July 2026$1.36 billion−$359,000
30 June 2026$1.36 billion+$125.4 million
31 May 2026$1.23 billion−$56.7 million
30 April 2026$1.29 billion−$48.2 million
31 March 2026$1.34 billion−$5.9 million
28 February 2026$1.34 billion+$243.1 million
31 January 2026$1.10 billion−$271.2 million
31 December 2025$1.37 billion+$665.0 million
30 November 2025$707.3 million−$392.3 million
31 October 2025$1.10 billion−$104.9 million
30 September 2025$1.20 billion+$474.9 million
31 August 2025$729.6 million−$748.8 million
31 July 2025$1.48 billion+$401.3 million
30 June 2025$1.08 billion+$149.8 million
31 May 2025$927.2 million−$564.8 million
30 April 2025$1.49 billion+$352.7 million
31 March 2025$1.14 billion−$199.2 million
28 February 2025$1.34 billion+$1.1 million
31 January 2025$1.34 billion−$682.2 million
31 December 2024$2.02 billion+$869.1 million
30 November 2024$1.15 billion−$148.3 million
31 October 2024$1.30 billion−$580.5 million
30 September 2024$1.88 billion+$792.7 million
31 August 2024$1.09 billion—

Building permits, every month shown on the chart above — newest first, with the change from the month before. A dash means the month before it was not published.

Approvals

What the City has approved

How many building permits the City of Toronto actually issued each month, and how many new homes those permits allow. A permit is permission to build — not a home, and not a home for sale.

This is the City’s own count of permits. The “Building permits” figure above it is Statistics Canada’s measure of what those permits are worth, for the wider Toronto region — a different question, from a different source, published about six weeks later.

The current month is left out until it is over, because a part-month always looks like a fall. Every figure covers the whole City of Toronto — permits are not published by ward.

Permits issued

As of 20 October 2026 · Checked 20 October 2026

2,765

Higher than 21 of the 23 earlier months recorded here. Up 966 from the same month a year earlier.

Permits issued over 24 months to 1 September 2026. Every figure is in the table below.07721,5442,3173,089Oct 2024Sep 2025Sep 2026

Building permits issued by the City of Toronto that month, counted from the City's own record of active permits. The axis starts at zero.

What this means for Permits issued

What it is. How many building permits the City of Toronto issued in a month — its permission for work to begin.

This number, in plain words. The City issued 2,765 building permits that month. That is a count of permissions granted — not what they are worth, which is the separate Statistics Canada figure above, and not work that has begun.

What up and down mean. When the line goes up, the City approved more work that month than the month before. When it goes down, it approved less.

What it does not say. A permit is not a building and not a home for sale — work may start years later, or never. It is also not the "building permits" figure higher up this page: that is Statistics Canada’s measure of what permits are worth across the wider Toronto region, published about six weeks later. This one is a count, for the City of Toronto only, and permits are not published by ward.

MonthPermits issuedChange from the month before
1 September 20262,765+82
1 August 20262,683−177
1 July 20262,860+67
1 June 20262,793+307
1 May 20262,486+224
1 April 20262,262+186
1 March 20262,076+468
1 February 20261,608−393
1 January 20262,001+416
1 December 20251,585+38
1 November 20251,547−417
1 October 20251,964+165
1 September 20251,799+219
1 August 20251,580+49
1 July 20251,531+84
1 June 20251,447+8
1 May 20251,439+55
1 April 20251,384+40
1 March 20251,344+373
1 February 2025971−200
1 January 20251,171+229
1 December 2024942−86
1 November 20241,028−491
1 October 20241,519—

Permits issued, every month shown on the chart above — newest first, with the change from the month before. A dash means the month before it was not published.

New homes approved

As of 20 October 2026 · Checked 20 October 2026

1,609

Higher than 10 of the 23 earlier months recorded here. Up 330 from the same month a year earlier.

New homes approved over 24 months to 1 September 2026. Every figure is in the table below.08511,7012,5523,402Oct 2024Sep 2025Sep 2026

New homes created by the permits issued that month, as counted on the permits themselves. A permit for a renovation creates none. The axis starts at zero.

What this means for New homes approved

What it is. How many new homes the permits issued in a month allow to be created.

This number, in plain words. The permits issued that month allow 1,609 new homes. They have permission and nothing more — none of them was started that month, and none was for sale that month.

What up and down mean. When the line goes up, the permits issued that month allow more new homes than the month before. When it goes down, they allow fewer.

What it does not say. Approved is not built and not started. These homes have permission and nothing more; “housing starts” higher up this page is the separate figure for work that actually began. It is also not a count of homes for sale.

MonthNew homes approvedChange from the month before
1 September 20261,609+426
1 August 20261,183−643
1 July 20261,826+143
1 June 20261,683−104
1 May 20261,787+419
1 April 20261,368−462
1 March 20261,830−157
1 February 20261,987+1,200
1 January 2026787−335
1 December 20251,122+824
1 November 2025298−1,483
1 October 20251,781+502
1 September 20251,279−345
1 August 20251,624−5
1 July 20251,629+1,320
1 June 2025309−1,466
1 May 20251,775−1,375
1 April 20253,150+1,540
1 March 20251,610+671
1 February 2025939+4
1 January 2025935−1,487
1 December 20242,422+808
1 November 20241,614+588
1 October 20241,026—

New homes approved, every month shown on the chart above — newest first, with the change from the month before. A dash means the month before it was not published.

Rental buildings

How the City rates rental buildings

The City inspects every rental apartment building of three storeys or more and gives it a score out of 100. It covers rented flats — not condominiums, which are not part of the programme and have no score of any kind here.

Only averages are shown here. The City publishes a score for each building; this page does not, and there is no ranking of buildings or of areas anywhere on this site.

90.6 out of 100

The average across 3,593 rental buildings the City has inspected in Toronto, holding 327,879 homes between them.

It is an average of whole buildings and not a score for any one of them — a building on your street may be well above it or well below it. Only rental buildings of three storeys or more are inspected, so a condominium has no score here at all.

What this means for Rental building evaluations

What it is. The City of Toronto inspects every rental building of three storeys or more under its RentSafeTO programme and gives it a score out of 100. This is the average of those scores, for the city and for each ward.

This number, in plain words. The average across every rental building the City has inspected is 90.6 out of 100. It is an average of whole buildings, not a score for any one of them — a building on your street may be well above it or well below it, and this page does not say which. It also covers rental buildings of three storeys or more, so a condominium has no score here at all.

What it does not say. It is not a score for any particular building, and this site does not publish one — the City publishes its scores building by building and we deliberately show only averages. It is not a ranking of areas and not advice about where to buy. It says nothing about condominiums, which are not inspected under this programme, so an area with no figure has not scored badly. And it is not a statement about the value of any property.

WardBuildings inspectedAverage score
01 · Etobicoke North8292.0
02 · Etobicoke Centre13293.8
03 · Etobicoke-Lakeshore25092.6
04 · Parkdale-High Park20690.7
05 · York South-Weston23887.9
06 · York Centre23591.0
07 · Humber River-Black Creek10390.4
08 · Eglinton-Lawrence24192.2
09 · Davenport9286.8
10 · Spadina-Fort York6290.4
11 · University-Rosedale14788.1
12 · Toronto-St. Paul's33890.9
13 · Toronto Centre21389.5
14 · Toronto-Danforth14789.1
15 · Don Valley West17093.0
16 · Don Valley East15991.5
17 · Don Valley North7491.8
18 · Willowdale4791.1
19 · Beaches-East York20291.2
20 · Scarborough Southwest16389.8
21 · Scarborough Centre13689.1
22 · Scarborough-Agincourt4292.5
24 · Scarborough-Guildwood7789.0
25 · Scarborough-Rouge Park2886.0

How the City has rated rental buildings in each ward, in the City’s own ward order — this is not a ranking. A ward with fewer than twenty inspected buildings is left out, because an average over a handful of buildings says more about those buildings than about the ward; those buildings are still counted in the Toronto figure above.

Your tax bill

What a reassessment does to your tax bill

Two different bodies decide what you pay. MPAC decides what your home is assessed at. The City decides the rate and sends the bill.

A reassessment does not change how much the City collects in total — it changes how that total is shared out. So your bill goes up only if your home’s assessed value rose by more than the average. If it rose by less than the average, your bill can fall even though your assessment went up.

What your own bill comes to depends on the rate for the year and on your assessment. Both are published — MPAC and the City are in the resource directory, and they are the only places those figures are current.

Short-term rentals

How many homes are let short-term

Homes registered with the City to be let short-term — the register behind the by-law that covers Airbnb-style letting. It counts registrations, not what is actually being let.

Counts only. The City publishes each registration at an address; this page shows none of them, and there is no list of properties anywhere on this site.

8,725

Homes in Toronto registered with the City to be let short-term.

These are the registrations the City holds, not a count of what is actually being let — somebody letting a home without registering does not appear here, and a registration does not mean the home is currently available. It counts whole homes and rooms alike, and it says nothing about which homes they are.

What this means for Short-term rental registrations

What it is. Homes registered with the City of Toronto to be let short-term — the register behind the by-law that covers Airbnb-style letting.

This number, in plain words. 8,725 homes there are registered with the City to be let short-term. That is the number of registrations the City holds — not a count of what is actually being let, and not a list of which homes they are.

What it does not say. It is not a count of how much short-term letting actually happens — somebody letting a home without registering does not appear, and a registration does not mean the home is available now. It is not a list of properties and this site publishes none. It is not a judgement about an area, and it is not a ranking: a ward with more registrations is not better or worse than one with fewer.

WardRegistered short-term rentals
01 · Etobicoke North77
02 · Etobicoke Centre148
03 · Etobicoke-Lakeshore375
04 · Parkdale-High Park413
05 · York South-Weston161
06 · York Centre135
07 · Humber River-Black Creek73
08 · Eglinton-Lawrence156
09 · Davenport570
10 · Spadina-Fort York2,665
11 · University-Rosedale823
12 · Toronto-St. Paul's233
13 · Toronto Centre984
14 · Toronto-Danforth399
15 · Don Valley West110
16 · Don Valley East73
17 · Don Valley North123
18 · Willowdale278
19 · Beaches-East York325
20 · Scarborough Southwest183
21 · Scarborough Centre104
22 · Scarborough-Agincourt95
23 · Scarborough North65
24 · Scarborough-Guildwood72
25 · Scarborough-Rouge Park85

Registered short-term rentals in each ward, in the City’s own ward order — this is not a ranking. A ward with none registered is left out rather than shown as zero, because “none registered” and “none in this extract” look the same from here.

Near you

What's being applied for near you

Applications filed with the City of Toronto — the public record of what somebody has asked permission to build. An application is not a promise that anything will be built.

Showing 60 of the 60 most recently filed applications across Toronto.

Willowdale · Ward 18

15 applications
  • Application Received

    221 FINCH AVE W

    Filed
    2 October 2026
    Reference
    26 248078 NNY 18 SA
    Site Plan Control Application proposes the development of an (_)-storey mixed-use building
    Show moreShow lessproviding residential, home occupation uses and commercial use at grade. The building will provide a total of (_) residential units, being a mix of 1-bedroom, 2-bedroom, 3-bedroom, and home occupation units. The building will also provide one retail unit at grade. A paved access from Yeomans road along the southern property line will be provided, leading to (_) levels of below-grade parking, providing a total of (_) parking spaces; as well as (_) bicycle parking spaces. The proposed development provides a total GFA of (_) square metres and a FSI of (_). Additionally, the proposed development provides (_) square metres of indoor amenity space and (_) square metres of outdoor amenity space.
  • Application Received

    221 FINCH AVE W

    Filed
    1 October 2026
    Reference
    26 247514 NNY 18 OZ

    Zoning By-law Amendment application to Lift the "(H)" Holding Symbol.

  • Application Received

    227 FINCH AVE W

    Filed
    1 October 2026
    Reference
    26 247514 NNY 18 OZ

    Zoning By-law Amendment application to Lift the "(H)" Holding Symbol.

  • Application Received

    225 FINCH AVE W

    Filed
    1 October 2026
    Reference
    26 247514 NNY 18 OZ

    Zoning By-law Amendment application to Lift the "(H)" Holding Symbol.

  • Application Received

    223 FINCH AVE W

    Filed
    1 October 2026
    Reference
    26 247514 NNY 18 OZ

    Zoning By-law Amendment application to Lift the "(H)" Holding Symbol.

  • Application Received

    127 FINCH AVE E

    Filed
    30 September 2026
    Reference
    26 246786 NNY 18 OZ
    OPA & Rezoning Application proposes the development of a 13-storey mixed-use building providing
    Show moreShow lessresidential and commercial use at grade. The building will provide a total of 235 residential units, being a mix of 1-bedroom, 2-bedroom, and 3-bedroom units. A paved access from Willowdale Ave along the southern property line will be provided, leading to 2 levels of below-grade parking, providing a total of 146 parking spaces; as well as 182 bicycle parking spaces. The proposed development provides a total GFA of 20,313.29 square metres and a FSI of 5.18. Additionally, the proposed development provides 497.19 square metres of indoor amenity space and 423.58 square metres of outdoor amenity space.
  • Application Received

    125 FINCH AVE E

    Filed
    30 September 2026
    Reference
    26 246786 NNY 18 OZ
    OPA & Rezoning Application proposes the development of a 13-storey mixed-use building providing
    Show moreShow lessresidential and commercial use at grade. The building will provide a total of 235 residential units, being a mix of 1-bedroom, 2-bedroom, and 3-bedroom units. A paved access from Willowdale Ave along the southern property line will be provided, leading to 2 levels of below-grade parking, providing a total of 146 parking spaces; as well as 182 bicycle parking spaces. The proposed development provides a total GFA of 20,313.29 square metres and a FSI of 5.18. Additionally, the proposed development provides 497.19 square metres of indoor amenity space and 423.58 square metres of outdoor amenity space.
  • Application Received

    819 WILLOWDALE AVE

    Filed
    30 September 2026
    Reference
    26 246786 NNY 18 OZ
    OPA & Rezoning Application proposes the development of a 13-storey mixed-use building providing
    Show moreShow lessresidential and commercial use at grade. The building will provide a total of 235 residential units, being a mix of 1-bedroom, 2-bedroom, and 3-bedroom units. A paved access from Willowdale Ave along the southern property line will be provided, leading to 2 levels of below-grade parking, providing a total of 146 parking spaces; as well as 182 bicycle parking spaces. The proposed development provides a total GFA of 20,313.29 square metres and a FSI of 5.18. Additionally, the proposed development provides 497.19 square metres of indoor amenity space and 423.58 square metres of outdoor amenity space.
  • Application Received

    119 FINCH AVE E

    Filed
    30 September 2026
    Reference
    26 246786 NNY 18 OZ
    OPA & Rezoning Application proposes the development of a 13-storey mixed-use building providing
    Show moreShow lessresidential and commercial use at grade. The building will provide a total of 235 residential units, being a mix of 1-bedroom, 2-bedroom, and 3-bedroom units. A paved access from Willowdale Ave along the southern property line will be provided, leading to 2 levels of below-grade parking, providing a total of 146 parking spaces; as well as 182 bicycle parking spaces. The proposed development provides a total GFA of 20,313.29 square metres and a FSI of 5.18. Additionally, the proposed development provides 497.19 square metres of indoor amenity space and 423.58 square metres of outdoor amenity space.
  • Application Received

    121 FINCH AVE E

    Filed
    30 September 2026
    Reference
    26 246786 NNY 18 OZ
    OPA & Rezoning Application proposes the development of a 13-storey mixed-use building providing
    Show moreShow lessresidential and commercial use at grade. The building will provide a total of 235 residential units, being a mix of 1-bedroom, 2-bedroom, and 3-bedroom units. A paved access from Willowdale Ave along the southern property line will be provided, leading to 2 levels of below-grade parking, providing a total of 146 parking spaces; as well as 182 bicycle parking spaces. The proposed development provides a total GFA of 20,313.29 square metres and a FSI of 5.18. Additionally, the proposed development provides 497.19 square metres of indoor amenity space and 423.58 square metres of outdoor amenity space.
  • Application Received

    123 FINCH AVE E

    Filed
    30 September 2026
    Reference
    26 246786 NNY 18 OZ
    OPA & Rezoning Application proposes the development of a 13-storey mixed-use building providing
    Show moreShow lessresidential and commercial use at grade. The building will provide a total of 235 residential units, being a mix of 1-bedroom, 2-bedroom, and 3-bedroom units. A paved access from Willowdale Ave along the southern property line will be provided, leading to 2 levels of below-grade parking, providing a total of 146 parking spaces; as well as 182 bicycle parking spaces. The proposed development provides a total GFA of 20,313.29 square metres and a FSI of 5.18. Additionally, the proposed development provides 497.19 square metres of indoor amenity space and 423.58 square metres of outdoor amenity space.
  • Under Review

    16 CAMERON AVE

    Filed
    29 September 2026
    Reference
    26 246324 NNY 18 SA
    Site Plan Control Application proposes the development of a 50-storey mixed-use building
    Show moreShow lessproviding residential and commercial use at grade. The building will provide a total of 569 residential units, being a mix of studio, 1-bedroom, 2-bedroom, and 3-bedroom units. A paved access from Cameron Ave along the west property line will be provided, leading to 3 levels of below-grade parking, providing a total of 114 parking spaces; as well as 385 bicycle parking spaces. The proposed development provides a total GFA of 40,200 square metres and a FSI of 21.27. Additionally, the proposed development provides 950 square metres of indoor amenity space and 757 square metres of outdoor amenity space.
  • Under Review

    4632-4648 YONGE ST

    Filed
    29 September 2026
    Reference
    26 246324 NNY 18 SA
    Site Plan Control Application proposes the development of a 50-storey mixed-use building
    Show moreShow lessproviding residential and commercial use at grade. The building will provide a total of 569 residential units, being a mix of studio, 1-bedroom, 2-bedroom, and 3-bedroom units. A paved access from Cameron Ave along the west property line will be provided, leading to 3 levels of below-grade parking, providing a total of 114 parking spaces; as well as 385 bicycle parking spaces. The proposed development provides a total GFA of 40,200 square metres and a FSI of 21.27. Additionally, the proposed development provides 950 square metres of indoor amenity space and 757 square metres of outdoor amenity space.
  • Under Review

    4632-4648 YONGE ST

    Filed
    29 September 2026
    Reference
    26 246327 NNY 18 OZ
    OPA & Rezoning Application proposes the development of a 50-storey mixed-use building providing
    Show moreShow lessresidential and commercial use at grade. The building will provide a total of 569 residential units, being a mix of studio, 1-bedroom, 2-bedroom, and 3-bedroom units. A paved access from Cameron Ave along the west property line will be provided, leading to 3 levels of below-grade parking, providing a total of 114 parking spaces; as well as 385 bicycle parking spaces. The proposed development provides a total GFA of 40,200 square metres and a FSI of 21.27. Additionally, the proposed development provides 950 square metres of indoor amenity space and 757 square metres of outdoor amenity space.
  • Under Review

    18 CAMERON AVE

    Filed
    29 September 2026
    Reference
    26 246324 NNY 18 SA
    Site Plan Control Application proposes the development of a 50-storey mixed-use building
    Show moreShow lessproviding residential and commercial use at grade. The building will provide a total of 569 residential units, being a mix of studio, 1-bedroom, 2-bedroom, and 3-bedroom units. A paved access from Cameron Ave along the west property line will be provided, leading to 3 levels of below-grade parking, providing a total of 114 parking spaces; as well as 385 bicycle parking spaces. The proposed development provides a total GFA of 40,200 square metres and a FSI of 21.27. Additionally, the proposed development provides 950 square metres of indoor amenity space and 757 square metres of outdoor amenity space.

Scarborough-Guildwood · Ward 24

9 applications
  • Under Review

    310 MORNINGSIDE AVE

    Filed
    22 September 2026
    Reference
    26 242184 ESC 24 SA

    Site Plan Approval for a 6-storey building with 40 residential units.

  • Under Review

    314 MORNINGSIDE AVE

    Filed
    22 September 2026
    Reference
    26 242184 ESC 24 SA

    Site Plan Approval for a 6-storey building with 40 residential units.

  • Under Review

    1 CENTRE ST

    Filed
    3 September 2026
    Reference
    26 231892 ESC 24 SA
    Proposed a twenty-three (23) storey mixed-use building with a seven (7) storey podium, comprised
    Show moreShow lessof a total of three-hundred-and-thirty-five (335) dwelling units and a total Gross Floor Area (¿GFA¿) of 21,167 square metres, including 386 square metres of retail/commercial floor space on the ground floor.
  • Under Review

    3178 EGLINTON AVE E

    Filed
    3 September 2026
    Reference
    26 231892 ESC 24 SA
    Proposed a twenty-three (23) storey mixed-use building with a seven (7) storey podium, comprised
    Show moreShow lessof a total of three-hundred-and-thirty-five (335) dwelling units and a total Gross Floor Area (¿GFA¿) of 21,167 square metres, including 386 square metres of retail/commercial floor space on the ground floor.
  • Under Review

    3174 EGLINTON AVE E

    Filed
    3 September 2026
    Reference
    26 231892 ESC 24 SA
    Proposed a twenty-three (23) storey mixed-use building with a seven (7) storey podium, comprised
    Show moreShow lessof a total of three-hundred-and-thirty-five (335) dwelling units and a total Gross Floor Area (¿GFA¿) of 21,167 square metres, including 386 square metres of retail/commercial floor space on the ground floor.
  • Under Review

    3182 EGLINTON AVE E

    Filed
    3 September 2026
    Reference
    26 231892 ESC 24 SA
    Proposed a twenty-three (23) storey mixed-use building with a seven (7) storey podium, comprised
    Show moreShow lessof a total of three-hundred-and-thirty-five (335) dwelling units and a total Gross Floor Area (¿GFA¿) of 21,167 square metres, including 386 square metres of retail/commercial floor space on the ground floor.
  • Under Review

    7 CENTRE ST

    Filed
    3 September 2026
    Reference
    26 231892 ESC 24 SA
    Proposed a twenty-three (23) storey mixed-use building with a seven (7) storey podium, comprised
    Show moreShow lessof a total of three-hundred-and-thirty-five (335) dwelling units and a total Gross Floor Area (¿GFA¿) of 21,167 square metres, including 386 square metres of retail/commercial floor space on the ground floor.
  • Under Review

    3176 EGLINTON AVE E

    Filed
    3 September 2026
    Reference
    26 231892 ESC 24 SA
    Proposed a twenty-three (23) storey mixed-use building with a seven (7) storey podium, comprised
    Show moreShow lessof a total of three-hundred-and-thirty-five (335) dwelling units and a total Gross Floor Area (¿GFA¿) of 21,167 square metres, including 386 square metres of retail/commercial floor space on the ground floor.
  • Under Review

    3180 EGLINTON AVE E

    Filed
    3 September 2026
    Reference
    26 231892 ESC 24 SA
    Proposed a twenty-three (23) storey mixed-use building with a seven (7) storey podium, comprised
    Show moreShow lessof a total of three-hundred-and-thirty-five (335) dwelling units and a total Gross Floor Area (¿GFA¿) of 21,167 square metres, including 386 square metres of retail/commercial floor space on the ground floor.

University-Rosedale · Ward 11

7 applications
  • Under Review

    864 BATHURST ST

    Filed
    23 September 2026
    Reference
    26 242430 STE 11 SA
    The proposal involves a 3-storey addition to the existing 2-storey building, resulting in a
    Show moreShow less5-storey mixed-use building. The development would retain medical office uses in the basement and ground floor, introduce commercial/office space on the second floor, and provide 15 residential units on floors three to five. The proposed building would contain approximately 920 m² of medical office space, 460 m² of commercial/office space, and 1,380 m² of residential space, for a total gross floor area of 2,760 m² (4.72 FSI).
  • Under Review

    862 BATHURST ST

    Filed
    23 September 2026
    Reference
    26 242430 STE 11 SA
    The proposal involves a 3-storey addition to the existing 2-storey building, resulting in a
    Show moreShow less5-storey mixed-use building. The development would retain medical office uses in the basement and ground floor, introduce commercial/office space on the second floor, and provide 15 residential units on floors three to five. The proposed building would contain approximately 920 m² of medical office space, 460 m² of commercial/office space, and 1,380 m² of residential space, for a total gross floor area of 2,760 m² (4.72 FSI).
  • Under Review

    860 BATHURST ST

    Filed
    23 September 2026
    Reference
    26 242430 STE 11 SA
    The proposal involves a 3-storey addition to the existing 2-storey building, resulting in a
    Show moreShow less5-storey mixed-use building. The development would retain medical office uses in the basement and ground floor, introduce commercial/office space on the second floor, and provide 15 residential units on floors three to five. The proposed building would contain approximately 920 m² of medical office space, 460 m² of commercial/office space, and 1,380 m² of residential space, for a total gross floor area of 2,760 m² (4.72 FSI).
  • Closed

    50 CUMBERLAND ST

    Filed
    9 September 2026
    Reference
    26 234558 STE 11 SA
    Address: 27-29 Yorkville Avenue and 26-32, 50 Cumberland Street Site Plan Administrative
    Show moreShow lessAmendment to previously approved 16 155457 STE 27 SA.
  • Closed

    27-29 YORKVILLE AVE

    Filed
    9 September 2026
    Reference
    26 234558 STE 11 SA
    Address: 27-29 Yorkville Avenue and 26-32, 50 Cumberland Street Site Plan Administrative
    Show moreShow lessAmendment to previously approved 16 155457 STE 27 SA.
  • Application Received

    700 BAY ST

    Filed
    2 September 2026
    Reference
    26 231153 STE 11 SA

    Proposed interior alterations to repurpose the existing building to create 249 purpose built rental units.

  • Application Received

    99 GERRARD ST W

    Filed
    2 September 2026
    Reference
    26 231153 STE 11 SA

    Proposed interior alterations to repurpose the existing building to create 249 purpose built rental units.

Toronto Centre · Ward 13

7 applications
  • Application Received

    7 LABATT AVE

    Filed
    30 September 2026
    Reference
    26 246687 STE 13 OZ
    Proposed 46-storey residential building and a 2-storey non-residential building. Overall, the
    Show moreShow lessbuildings contain a total of 1,170 dwelling units, 72,748.1 sq. m of residential Gross Floor Area and 1,110.8 sq. m. of non-residential GFA, resulting in a Floor Space Index of approximately 13.67.
  • Application Received

    77 RIVER ST

    Filed
    30 September 2026
    Reference
    26 246687 STE 13 OZ
    Proposed 46-storey residential building and a 2-storey non-residential building. Overall, the
    Show moreShow lessbuildings contain a total of 1,170 dwelling units, 72,748.1 sq. m of residential Gross Floor Area and 1,110.8 sq. m. of non-residential GFA, resulting in a Floor Space Index of approximately 13.67.
  • Application Received

    1 SUMACH ST

    Filed
    18 September 2026
    Reference
    26 239852 STE 13 OZ

    Lift the (H)

  • Under Review

    134 JARVIS ST

    Filed
    2 September 2026
    Reference
    26 231294 STE 13 SA

    Proposed 11-space surface commercial parking lot.

  • Application Received

    69 YONGE ST

    Filed
    2 September 2026
    Reference
    26 231533 STE 13 SA

    The City did not publish a description for this application.

  • Under Review

    136 JARVIS ST

    Filed
    2 September 2026
    Reference
    26 231294 STE 13 SA

    Proposed 11-space surface commercial parking lot.

  • Application Received

    335 YONGE ST

    Filed
    31 August 2026
    Reference
    26 229154 STE 13 SA
    This application is to facilitate a Site Plan Agreement for the subject site, which would permit
    Show moreShow lessan extension of the temporary use permit for the outdoor market.

Etobicoke-Lakeshore · Ward 03

3 applications

York South-Weston · Ward 05

3 applications

York Centre · Ward 06

3 applications
  • Under Review

    6 TIPPETT RD

    Filed
    24 September 2026
    Reference
    26 243483 NNY 06 SA

    Site Plan Amendment application to amend Site Plan application no. 18 150482 NNY 10 SA

  • Under Review

    221-245 WILMINGTON AVE

    Filed
    15 September 2026
    Reference
    26 237896 NNY 06 SA
    This Site Plan Control application pertains to Block 2, which forms part of a larger 149-unit,
    Show moreShow lessthree-storey townhouse development that includes an outdoor amenity area.A previous Site Plan Control Application [2017 278262 NNY 10 SA] was approved by the OLT; however, the owner has since reconfigured the site and submitted a revised Site Plan Control Application.Please note the concurrent Site Plan Control Application [2026 237903 NNY 06 SA] for Block 1 and the related Committee of Adjustment Application [20 26 239367 NNY 06 MV].
  • Under Review

    221-245 WILMINGTON AVE

    Filed
    15 September 2026
    Reference
    26 237903 NNY 06 SA
    This Site Plan Control application pertains to Block 1, which forms part of a larger 149-unit,
    Show moreShow lessthree-storey townhouse development that includes an outdoor amenity area.A previous Site Plan Control Application [2017 278262 NNY 10 SA] was approved by the OLT; however, the owner has since reconfigured the site and submitted a revised Site Plan Control Application.Please note the concurrent Site Plan Control Application [2026 237896 NNY 06 SA] for Block 2 and the related Committee of Adjustment Application [20 26 239367 NNY 06 MV].

Scarborough Southwest · Ward 20

3 applications

Scarborough-Agincourt · Ward 22

3 applications

Etobicoke North · Ward 01

1 application
  • Under Review

    165 ATTWELL DR

    Filed
    3 September 2026
    Reference
    26 232049 WET 01 SA
    Site Plan Control Applications proposes to convert existing office building into a proposed 37
    Show moreShow lesssuite hotel with adult day program (aimed toward people with dementia).

Davenport · Ward 09

1 application
  • Under Review

    259 GEARY AVE

    Filed
    25 September 2026
    Reference
    26 244607 STE 09 SA

    The City did not publish a description for this application.

Spadina-Fort York · Ward 10

1 application
  • Application Received

    689 KING ST W

    Filed
    1 October 2026
    Reference
    26 247458 STE 10 OZ
    Proposed 30-storey mixed-use development, comprised of hotel uses on the first 13-storeys,
    Show moreShow lessincluding a restaurant and 251 hotel suites, and residential uses above, between levels 14-30, including a total of 160 purpose-built rental units.

Toronto-St. Paul's · Ward 12

1 application

Don Valley West · Ward 15

1 application

Don Valley East · Ward 16

1 application

Scarborough North · Ward 23

1 application
  • Under Review

    20 PULLMAN CRT

    Filed
    30 September 2026
    Reference
    26 246849 ESC 23 SA
    The proposed development consists of a three¿storey expansion to the existing data centre
    Show moreShow lessbuilding,with a Gross Floor Area (GFA) of approximately 7,076.26 square metres. Including the existingbuilding, the total GFA on site will be approximately 11,456.25 square metres, resulting in a FloorSpace Index (FSI) of 0.70. The three-storey expansion is designed to accommodate interiorgenerators and transformers at grade, mechanical and electrical support spaces on the upper levels,and new data halls.

How to read this

How to read this page

Every figure above, what it is, how it is worked out, and the part most pages leave out — what it does not tell you. Each figure above also carries its own “?” where it appears.

The new housing price index

What it is. A measure of what newly built homes cost in Toronto, expressed against a base year set to 100.

How it is worked out. Statistics Canada surveys builders for the selling price of comparable new houses and land, monthly, holding the specification constant so the figure reflects price rather than a change in what is being built.

What it does not say. It is not a resale price and it is not a dollar amount. A reading of 106 means six per cent above the base year, not $106 and not $106,000. It says nothing about what an existing home sells for.

Housing starts

What it is. The number of homes on which construction physically began in Toronto in a given month.

How it is worked out. Counted by Canada Mortgage and Housing Corporation for centres of 10,000 people and over, and published monthly by Statistics Canada.

What it does not say. It says nothing about when those homes will be finished, or whether they are for sale. A month with few starts is not a shortage today — it is a shortage in two or three years.

Building permits

What it is. The total value of residential building permits issued in Toronto in a given month.

How it is worked out. Collected by Statistics Canada from municipalities. The figure is the value the permit was issued for, unadjusted, in current dollars.

What it does not say. A permit is a permission, not a building. Some are never used, and the value on a permit is not what the finished homes will sell for.

The interest rates

What it is. The Bank of Canada's policy rate, the five-year government benchmark yield, prime, and the posted five-year conventional mortgage rate.

How it is worked out. Read from the Bank of Canada each morning. The policy rate and the benchmark yield are published every business day; prime and the conventional rate weekly.

What it does not say. None of them is a rate you would be offered. A lender prices a mortgage on your circumstances, and a broker can quote a real figure. Nothing here is a prediction of where rates go next.

Development applications

What it is. Applications filed with the City of Toronto seeking permission to build or change a property.

How it is worked out. Published by the City as open data and refreshed here every morning. The site keeps the most recently filed ones rather than the full history.

What it does not say. An application is not an approval and not a building. Many are refused, withdrawn or changed beyond recognition, and the ones shown here are only the most recent — an older application near you may not appear.

Building permits issued

What it is. How many building permits the City of Toronto issued in a month — its permission for work to begin.

How it is worked out. Counted from the City's own record of active permits, which is published as open data and refreshed here every morning. Permits with no issue date have not been issued and are not counted. The month in progress is left out until it is over, because a part-month always reads as a fall.

What it does not say. A permit is not a building and not a home for sale — work may start years later, or never. It is also not the "building permits" figure higher up this page: that is Statistics Canada’s measure of what permits are worth across the wider Toronto region, published about six weeks later. This one is a count, for the City of Toronto only, and permits are not published by ward.

New homes approved

What it is. How many new homes the permits issued in a month allow to be created.

How it is worked out. Taken from the dwelling-unit count recorded on each permit by the City, added up by the month the permit was issued. A permit for a renovation or a repair creates none and adds nothing.

What it does not say. Approved is not built and not started. These homes have permission and nothing more; “housing starts” higher up this page is the separate figure for work that actually began. It is also not a count of homes for sale.

Short-term rental registrations

What it is. Homes registered with the City of Toronto to be let short-term — the register behind the by-law that covers Airbnb-style letting.

How it is worked out. Counted from the City's own register, published as open data and refreshed here every morning. Every figure is a count for a whole ward; the register is published at an address and this site publishes none of them.

What it does not say. It is not a count of how much short-term letting actually happens — somebody letting a home without registering does not appear, and a registration does not mean the home is available now. It is not a list of properties and this site publishes none. It is not a judgement about an area, and it is not a ranking: a ward with more registrations is not better or worse than one with fewer.

Rental building evaluations

What it is. The City of Toronto inspects every rental building of three storeys or more under its RentSafeTO programme and gives it a score out of 100. This is the average of those scores, for the city and for each ward.

How it is worked out. Read from the City's own open data and refreshed here every morning. A building inspected more than once counts once, at its most recent score. The figures cover inspections from 2023 onward, and a ward with fewer than twenty evaluated buildings is left out rather than averaged.

What it does not say. It is not a score for any particular building, and this site does not publish one — the City publishes its scores building by building and we deliberately show only averages. It is not a ranking of areas and not advice about where to buy. It says nothing about condominiums, which are not inspected under this programme, so an area with no figure has not scored badly. And it is not a statement about the value of any property.

Why some figures show two dates

What it is. "As of" is the date the figure refers to. "Checked" is the last time the site asked the source whether it had changed.

How it is worked out. Some sources publish on a schedule and some publish when they publish. Where there is no schedule — the City's applications, for instance — an old figure is correct rather than late, and what would be a fault is our not having looked.

What it does not say. A "checked" date is not a guarantee the figure is right. It means the source was reachable and said the same thing.

Sources

Where these figures come from

Contains information licensed under the Open Government Licence – Toronto. Short Term Rentals Registration, 20 October 2026.

Contains information licensed under the Open Government Licence – Toronto. Apartment Building Evaluation, 8 October 2026.

Contains information licensed under the Open Government Licence – Toronto. Building Permits – Active Permits, 20 October 2026.

Contains information licensed under the Open Government Licence – Toronto. Development Applications, 20 October 2026.

Source: Statistics Canada, New housing price index, monthly (18-10-0205), 31 August 2026. Reproduced and distributed on an "as is" basis with the permission of Statistics Canada.

Source: Statistics Canada, Canada Mortgage and Housing Corporation, housing starts, under construction and completions in centres 10,000 and over (34-10-0143), 30 September 2026. Reproduced and distributed on an "as is" basis with the permission of Statistics Canada.

Source: Statistics Canada, Building permits, by type of structure and type of work (34-10-0292), 31 July 2026. Reproduced and distributed on an "as is" basis with the permission of Statistics Canada.

Source: Bank of Canada, Conventional mortgage: 5-year, 14 October 2026. Reproduced without modification. This does not constitute an endorsement by the Bank of Canada.

Source: Bank of Canada, Prime rate, 14 October 2026. Reproduced without modification. This does not constitute an endorsement by the Bank of Canada.

Source: Bank of Canada, Benchmark bond yield: 5 year, 19 October 2026. Reproduced without modification. This does not constitute an endorsement by the Bank of Canada.

Source: Bank of Canada, Target for the overnight rate (business daily), 19 October 2026. Reproduced without modification. This does not constitute an endorsement by the Bank of Canada.

This page publishes figures other people collected. It offers no forecast and no opinion of the value of any particular property.